HomeDamage repair and finishing

Repair and finishing

The room back to how it was.

Drying, plastering, painting, tiling and flooring. We only finish once the substrate is dry, because paint over damp comes back within six months. Scheduled in consultation with the resident.

We measure whether it is dry before finishingOur own plasterers and paintersWork scheduled around the resident
Schilder van Forward giet verf over voor het afwerken van een ruimte

What needs repairing?

Tap what applies to your situation.

Moisture has broken the bond. The loose section comes off, the substrate dries, then re-plastering and painting.
Often superficial, but painting over will not work if the substrate still holds moisture. We measure first.
Treated and removed, and above all: the cause has to go. Otherwise it is back within a season.
Swollen joints or a wet subfloor. We assess what can be saved and what must be replaced.
Loose tiles and affected joints after a leak. Restored in the same finish where possible.
0 selected Report this

How we handle it

  1. Inspection of the repair work

    We look at what needs repairing and measure the moisture content.

  2. Drying

    With dryers where needed. We only continue once the readings are right.

  3. Preparation

    Loose material removed, substrate prepared, the room covered.

  4. Finishing

    Plastering, painting, tiling and flooring restored to the original state.

  5. Handover

    Walked through together, photos into the case file, and the space left clean.

What it costs

For an insured claim the repair is part of the estimate sent to the insurer. You see in advance what is covered and what is not. Without insurance we work on an itemised quote per element.

Vraag het aan

Response within one working day

Questions we are often asked

Can I stay in the house during the repair?

In most cases, yes. We work room by room, cover the area and leave it clean. For major repairs we discuss beforehand what that means for you.

How long does the drying take?

That depends on the construction. A plasterboard ceiling dries in days; a saturated concrete floor can take weeks. We measure rather than guess.

Will it be exactly the same colour and tile?

We match as closely as possible. If a tile is no longer available, we discuss the options before anything is removed.

Do you also do only the finishing?

Yes. If a report already exists, or the cause has been repaired by someone else, we can carry out the repair as a separate assignment.

Need repair and finishing?

Report it online and we will call you back.

Response within one working day Inspection without obligation No hidden costs
Emergency Report damage